Bitmain Antminer S23 XP Hyd 600TH/s Hydro-Cooled Bitcoin Miner
The Bitmain Antminer S23 XP Hyd is a next-generation SHA-256 ASIC miner designed for professional Bitcoin mining facilities. It delivers a manufacturer-rated hashrate of 600 TH/s while consuming 5,340W, producing an energy efficiency of 8.9 J/TH.
High-Efficiency SHA-256 Mining
At 8.9 J/TH, the S23 XP Hyd is designed for operators who need more Bitcoin hashrate from available electrical capacity. It can mine Bitcoin (BTC), Bitcoin Cash (BCH), Bitcoin SV (BSV) and other compatible SHA-256 coins.
Hydro-Cooled Industrial Design
This is a hydro-cooled mining server, not a conventional air-cooled or home miner. Deployment requires a compatible coolant loop, pumps, piping, heat rejection equipment, monitoring and suitable facility power. Buyers should confirm all electrical and cooling requirements against Bitmain’s final technical documentation before installation.
Verified Specifications
| Manufacturer | Bitmain |
|---|---|
| Series | Antminer S23 |
| Model | Antminer S23 XP Hyd |
| Algorithm | SHA-256 |
| Rated Hashrate | 600 TH/s |
| Rated Power Consumption | 5,340W |
| Rated Energy Efficiency | 8.9 J/TH |
| Cooling | Hydro cooling |
| Manufacturer Availability | Futures |
| Expected Manufacturer Shipping | November 2026 to January 2027 |
Who Should Consider This Miner?
The S23 XP Hyd is intended for established mining farms, professional operators and data-centre deployments with compatible hydro infrastructure. It is not recommended for ordinary residential circuits or first-time users without specialist installation support.
Pre-Order and Sourcing Notice
Availability, batch allocation, final selling price, warranty handling, delivery terms, customs charges and shipping costs must be confirmed before payment. Mining-Now can help buyers verify infrastructure requirements and request current supplier availability.
Before Requesting a Quote
- Confirm your electricity price per kWh.
- Confirm available electrical capacity and facility power.
- Confirm that a compatible hydro-cooling loop is installed or planned.
- Provide the intended delivery country and required quantity.
- Request written confirmation of batch dates, warranty responsibility and shipping terms.
Mining profitability changes with network difficulty, coin price, electricity cost, pool fees and operating conditions. No fixed return is guaranteed.
Related resources: Browse Hydro-Cooling Miners · Shop all mining equipment · Mining support · Contact Mining Now




Reviews
There are no reviews yet.